Interpretation 90.1-2019-6 - June 9, 2021 ( Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section 6.5.2, regarding the application of Section 6.5.2 to hospital zones.) Interpretation 90.1-2019-5 - March 31, 2021 ( Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Sections 6.5.3.5 and 6.5.3.5.1, regarding supply air temperature reset.) Interpretation 90.1-2019-4 - J( Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Tables 9.4.2-2 and G3.6, regarding Appendix G baseline building exterior lighting.) Interpretation 90.1-2019-3 - J( Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section G3.1.3.7, regarding Appendix G type and number of baseline chillers.) Interpretation 90.1-2019-2 - J( Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section 6 and Table 6.8.1-16, regarding minimum efficiency requirements for heat pump and heat recovery chiller packages.) Interpretation 90.1-2019-1 - J( Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section 6 and Table 6.8.1-16, regarding minimum efficiency requirements for heat pump and heat recovery chiller packages.) NOTE: All documents linked from this page are in PDF-format.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |